Stainless Steel 316 Marine Hardware Plough Anchor
Overview Product Description Our Advantages With our own stainless steel investment casting production lines and machini
Description
Basic Info.
Export Markets | Global |
Top Handrail Size | 38.1mm/42.4mm/50.8mm |
Wattanty | 10 Years |
Delivery Time | 20-25 Days After Deposit Confirmed |
Glass(T) | 10mm-20mm |
Surface | Satin or Mirror |
Transport Package | Standard Export Cartons |
Specification | CE, ROHS, SGS |
Trademark | ABLinox |
Origin | Guangdong |
HS Code | 730890000 |
Production Capacity | 100, 000PCS/Month |
Product Description
Product DescriptionBrand | ABLinox |
Material | Stainless steel 304/316 |
Surface finish | Satin or mirror |
Deliver time | 30-35 days |
Payment terms | L/C, T/T, Western Union, Paypal |
Custom services | Warmly welcome |
Package | Export Packing |
Other products we can offer | Stainless steel handrail,,Stainless steel glass balustrade,Stainless steel faucet ,Stainless steel bath shower,Stainless steel bathroom accessories ,Stainless steel casting and soon. |
- With our own stainless steel investment casting production lines and machining lines, give you one stop services.
- With CNC(CNC CENTER),we make the tooling by ourselves.Make you easiler.
- With 50000 square meters workshop located in Zhaoqing city, near Guangzhou port, transportation is convenient.
- Use Germany Spectrometer and Salty Spray to test the raw material.
- We have 15 engineers with strong ability in design and develop new products.
- With ISO 9001:2015, ISO 14001 and OHSAS 18001 system.
- With ERP system,We can give you the production and delivery information at the first time. Also if any quality problem,We can source it and give you the solution very fast.
- Fast reply within 12 hours.
Production Process
Steps | Time | |
Tooling Making | CNC Center | 7 days |
Casting Process | Wax Injection | 2 days |
Sand Shell Molding | 5 days | |
Dewaxing | 1 days | |
Pouring | 1 days | |
Cutting | 1 days | |
Grinding | 1 days | |
Cleaning | 1 days | |
Machining Process | CNC | 2 days |
Drilling & Tapping | 2 days | |
Welding | 2 days | |
Stamping | 1 days | |
Polishing | 5 days | |
Assembling | Ultrasonic Washing | 1 days |
Water Testing | 1 days | |
Assembling | 2 days | |
Remark: The production time base on standard quantity and process |
Our mission
To change the world's view about Chinese product.
To be the leader in precision casting industry
Our dream
- To gain Win-win achievement with all of our clients and supplies
- To be an international famous brand.
- To be a one-hundred-year company
- Reply you fast within 12 hours.
- Have someone to follow up all your inquiry and order.
- We will offer satisfied quality and prices to you.
Our factory located in Zhaoqing City, Guangdong Province. Factory 50000 square meters with 265 workers.
2.What is your payment term?
We do T/T, 30% deposit, balance before delivery. We can also accept L/C.
3.What is the production time?
Casting part need 20 to 30 days.
Balustrade and handrail accessories need 25 to 35 days.
Faucet and shower need 40 to 60 days.
4.Is that possible to visit the factory?
Sure, we sincerely welcome you to visit our factory, we can also pick you from the hotel.
Prev: Most Popular Manufacturer 316 Stainless Steel Marine Hardware Other Marine Supplies for Yacht
Next: OEM Manufacturers Steel Casting Aluminum Fabrication Sheet Metal Bending Pipe with Flange
Our Contact
Send now